Triple
T36365479
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oji Depot |
E895610
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Tokyo Metro facility |
C62542
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Tokyo Metro facility Context triple: [Oji Depot, instanceOf, Tokyo Metro facility]
-
A.
Osaka Metro facility
An Osaka Metro facility is any physical structure, station, depot, or related infrastructure owned or operated by Osaka Metro that supports the operation, maintenance, or use of its urban rail transit system.
-
B.
Tokyo subway station
A Tokyo subway station is an underground or partially above-ground transit facility in Tokyo that serves as a node for multiple subway lines, providing passenger access, ticketing, and platform areas within a dense urban rail network.
-
C.
Yokohama Municipal Subway station
A Yokohama Municipal Subway station is a public transit facility within Yokohama’s subway network where passengers access, board, and transfer between municipal subway trains and related services.
-
D.
Kyoto Municipal Subway station
A Kyoto Municipal Subway station is a public transit facility within Kyoto’s subway network where passengers board, alight, and transfer between trains and other transportation services.
-
E.
Tobu Railway station
A Tobu Railway station is a passenger rail facility operated by the private Japanese company Tobu Railway, serving as a stop for its regional and commuter train services.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e5044248190b390d8887dc03254 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:10 p.m.