Triple
T36354169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Braidwood Nuclear Generating Station |
E895293
|
entity |
| Predicate | thermalCapacity_MWt_perUnit |
P95775
|
FINISHED |
| Object | about 3465 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: about 3465 | Statement: [Braidwood Nuclear Generating Station, thermalCapacity_MWt_perUnit, about 3465]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: thermalCapacity_MWt_perUnit Context triple: [Braidwood Nuclear Generating Station, thermalCapacity_MWt_perUnit, about 3465]
-
A.
thermalCapacityPerReactor_MWth
chosen
Indicates the amount of thermal power capacity, measured in megawatts thermal (MWth), associated with each individual reactor.
-
B.
thermalPower
Indicates the amount of heat energy per unit time that a system, device, or process generates, transfers, or consumes.
-
C.
electricalCapacityPerReactor_MWe
Indicates the electrical power output capacity, measured in megawatts electric (MWe), that is provided by each individual reactor.
-
D.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
E.
plannedCapacityMW
Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4f437c8190a1af3ea2564f41f5 |
completed | May 3, 2026, 3:48 p.m. |
| NER | Named-entity recognition | batch_69f7bb3ff1b08190802b1063d55d3923 |
completed | May 3, 2026, 9:16 p.m. |
| PD | Predicate disambiguation | batch_69f7b9a611a081908dd6aec1df3f4d7f |
completed | May 3, 2026, 9:09 p.m. |
Created at: May 3, 2026, 4:09 p.m.