Triple
T36350052
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | South Ring Road (various stages) |
E895176
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-phase roadway project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-phase roadway project Context triple: [South Ring Road (various stages), instanceOf, multi-phase roadway project]
-
A.
toll road project
A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
-
B.
public transit and highway improvement program
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
-
C.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
D.
planned expressway
A planned expressway is a proposed high-speed, limited-access roadway that has been formally designed and approved but not yet constructed or opened to traffic.
-
E.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4f437c8190a1af3ea2564f41f5 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:09 p.m.