Triple
T36315728
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Mill (Celbridge) |
E894184
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mill building complex |
C53098
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mill building complex Context triple: [The Mill (Celbridge), instanceOf, mill building complex]
-
A.
mill-related building
chosen
A mill-related building is a structure designed to house machinery and processes for grinding, processing, or manufacturing materials—such as grain, textiles, or lumber—often powered by water, wind, or other mechanical means.
-
B.
red-brick building complex
A red-brick building complex is a clustered arrangement of interconnected or closely situated structures primarily constructed with red brick, often sharing architectural style, function, and shared spaces.
-
C.
museum building complex
A museum building complex is a coordinated group of structures and spaces designed to collect, preserve, exhibit, and interpret cultural, historical, artistic, or scientific artifacts for public education and enjoyment.
-
D.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
-
E.
market hall complex
A market hall complex is a large, often multi-building facility that houses a variety of vendors, shops, and services under one coordinated marketplace environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4d1a788190a6ab6ccca28547a7 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:09 p.m.