Triple

T3630559
Position Surface form Disambiguated ID Type / Status
Subject Machame Route E76943 entity
Predicate successRateRelative P7192 FINISHED
Object higher than Marangu Route LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: higher than Marangu Route | Statement: [Machame Route, successRateRelative, higher than Marangu Route]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: successRateRelative
Context triple: [Machame Route, successRateRelative, higher than Marangu Route]
  • A. successRate chosen
    Indicates the proportion or frequency with which attempts at a given action or process result in a successful outcome.
  • B. successMetric
    Indicates the specific criterion or measure used to evaluate whether an action, process, or relationship has achieved its intended success.
  • C. completionRate
    Indicates the proportion of a task, process, or set of items that has been finished relative to its total intended amount.
  • D. speedAchieved
    Indicates that a particular speed has been reached or attained by an entity during an event or action.
  • E. spinRate
    Indicates the rotational speed at which an object or system is spinning, typically measured as revolutions per unit time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85dc03948190b35b7189e4175bcc completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc30136e88190922bb542971b5239 completed March 8, 2026, 6:42 p.m.
PD Predicate disambiguation batch_69adb8410a5881909c94818d7060b2b0 completed March 8, 2026, 5:56 p.m.
Created at: March 8, 2026, 3:23 p.m.