Triple
T36294129
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | William Calder |
E893311
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road engineer |
C254
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road engineer Context triple: [William Calder, instanceOf, road engineer]
-
A.
civil engineer
chosen
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
B.
road manager
A road manager is responsible for planning, coordinating, and overseeing the maintenance, safety, and efficient operation of road networks within a designated area.
-
C.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
D.
civil engineering designation
A civil engineering designation is a formal title or credential that identifies a professional’s qualification, specialization, and authority to practice within the civil engineering field.
-
E.
engineering regulator
An engineering regulator is an entity or mechanism that establishes, enforces, and monitors technical standards, safety requirements, and compliance within engineering practices and systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4a61f0819084a2b68dbbb4efc6 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:09 p.m.