Triple

T36293409
Position Surface form Disambiguated ID Type / Status
Subject Eastern Region E893293 entity
Predicate electrificationIncluded P194012 FINISHED
Object 25 kV AC overhead electrification LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 25 kV AC overhead electrification | Statement: [Eastern Region, electrificationIncluded, 25 kV AC overhead electrification]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationIncluded
Context triple: [Eastern Region, electrificationIncluded, 25 kV AC overhead electrification]
  • A. electrificationIncludes chosen
    Indicates that a broader electrification process or project encompasses, contains, or makes use of a specified component, measure, or sub-activity.
  • B. electrificationCompatibility
    Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
  • C. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • D. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • E. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e4a61f0819084a2b68dbbb4efc6 completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69ff70ecc1a481909571b18d56d982b8 completed May 9, 2026, 5:37 p.m.
PD Predicate disambiguation batch_69ff70322a3c8190837840ea42cd3093 completed May 9, 2026, 5:34 p.m.
Created at: May 3, 2026, 4:09 p.m.