Triple
T36281134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lo Pan |
E892943
|
entity |
| Predicate | cultStatusOfWork |
P15621
|
FINISHED |
| Object | cult classic film |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: cult classic film | Statement: [Lo Pan, cultStatusOfWork, cult classic film]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: cultStatusOfWork Context triple: [Lo Pan, cultStatusOfWork, cult classic film]
-
A.
cultStatus
chosen
Indicates that something has achieved a devoted, niche following or admiration that is disproportionate to its mainstream popularity.
-
B.
legalStatusOfWork
Indicates the legal classification or protection status that applies to a particular work (e.g., copyrighted, public domain, licensed).
-
C.
hasCreativeWorkStatus
Indicates the current state or condition of a creative work within its lifecycle (e.g., planned, in progress, completed, or published).
-
D.
worksStatus
Indicates the current state or condition of an entity’s work or project, such as whether it is planned, in progress, completed, or otherwise categorized.
-
E.
careerStatus
Indicates the current stage, position, or condition of an entity within its professional or occupational life.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4955c08190b8cfddca34fc0242 |
completed | May 3, 2026, 3:48 p.m. |
| NER | Named-entity recognition | batch_69f7ba6d06f48190a71b5a2f19e2232f |
completed | May 3, 2026, 9:13 p.m. |
| PD | Predicate disambiguation | batch_69f7b9a4aad48190a62e41c5e39339d9 |
completed | May 3, 2026, 9:09 p.m. |
Created at: May 3, 2026, 4:09 p.m.