Triple

T36240950
Position Surface form Disambiguated ID Type / Status
Subject Long Thanh International Airport E891514 entity
Predicate plannedPhases P40796 FINISHED
Object 3 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 3 | Statement: [Long Thanh International Airport, plannedPhases, 3]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedPhases
Context triple: [Long Thanh International Airport, plannedPhases, 3]
  • A. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • B. redevelopmentPhasing
    Indicates the planned sequence and timing in which different parts of a redevelopment project are to be carried out.
  • C. capitalPhase
    Indicates a relationship where an entity is in a particular stage or phase of capital development, investment, or funding.
  • D. programPhase
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • E. builtInPhases chosen
    Indicates that something is constructed, developed, or implemented in distinct, sequential stages or phases.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e44993481908fa75e4c48d0aab3 completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69fd485f57dc8190820365396d041991 completed May 8, 2026, 2:20 a.m.
PD Predicate disambiguation batch_69fd47d35da081908bec8901018d186c completed May 8, 2026, 2:17 a.m.
Created at: May 3, 2026, 4:09 p.m.