Triple

T36236839
Position Surface form Disambiguated ID Type / Status
Subject National Infrastructure Strategy E891398 entity
Predicate instanceOf P0 FINISHED
Object UK infrastructure plan C37425 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: UK infrastructure plan
Context triple: [National Infrastructure Strategy, instanceOf, UK infrastructure plan]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. cross-Channel transport infrastructure
    Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
  • C. infrastructure strategy report chosen
    A comprehensive document that analyzes current infrastructure assets, forecasts future needs, and outlines prioritized investments and policies to guide long-term infrastructure development and management.
  • D. government infrastructure pipeline
    A government infrastructure pipeline is a structured, long-term sequence of planned, funded, and prioritized public works projects—such as transportation, utilities, and civic facilities—designed to guide investment, development, and maintenance of essential national or regional infrastructure.
  • E. UK national project
    A UK national project is a large-scale, government-backed initiative undertaken across the United Kingdom to achieve strategic social, economic, infrastructural, or technological objectives of national importance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e4387048190a1b27bcbf4ec7423 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:09 p.m.