Triple

T36223858
Position Surface form Disambiguated ID Type / Status
Subject Maxar 1300-class bus E1047928 entity
Predicate instanceOf P0 FINISHED
Object geostationary satellite platform C42677 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geostationary satellite platform
Context triple: [Maxar 1300-class bus, instanceOf, geostationary satellite platform]
  • A. geostationary communications satellite
    A geostationary communications satellite is a spacecraft positioned in an equatorial orbit that matches Earth's rotation, remaining fixed over one longitude to relay telecommunications signals between ground stations.
  • B. satellite platform derivative chosen
    A satellite platform derivative is a modified version of an existing satellite bus or platform, adapted with changes in structure, subsystems, or payload interfaces to meet new mission requirements while leveraging the original design.
  • C. geostationary weather satellite
    A geostationary weather satellite is an Earth-orbiting spacecraft positioned over the equator at a fixed longitude, continuously monitoring the same region to collect atmospheric and surface data for weather observation and forecasting.
  • D. geostationary orbit
    A geostationary orbit is a circular, equatorial orbit around Earth in which a satellite moves at the same rotational speed as the planet, appearing fixed over a single point on the equator.
  • E. satellite system
    A satellite system is an integrated network of orbiting spacecraft, ground stations, and communication links designed to perform functions such as communication, navigation, Earth observation, or scientific research.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e42c878819095c8d19c0267fb87 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:09 p.m.