Triple

T36204443
Position Surface form Disambiguated ID Type / Status
Subject Mercury Planetary Orbiter E1047352 entity
Predicate plannedMissionPhase P184641 FINISHED
Object Mercury orbit operations LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mercury orbit operations | Statement: [Mercury Planetary Orbiter, plannedMissionPhase, Mercury orbit operations]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedMissionPhase
Context triple: [Mercury Planetary Orbiter, plannedMissionPhase, Mercury orbit operations]
  • A. missionProfilePhase chosen
    Indicates the specific phase or stage within a mission profile during which an action, condition, or relationship is applicable.
  • B. currentMissionPhase
    Indicates the specific phase or stage that a mission is presently in within its overall lifecycle.
  • C. missionDurationPlanned
    Indicates the length of time that a mission is scheduled or intended to last according to its plan.
  • D. missionPlanning
    Indicates the process of defining, organizing, and coordinating actions or operations needed to achieve a specific mission objective.
  • E. coversMissionPhase
    Indicates that one entity’s scope, responsibility, or applicability extends over a specified mission phase.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e414bdc8190996f15a544220a3d completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69fd3a69f1e08190a11aed015bff0858 completed May 8, 2026, 1:20 a.m.
PD Predicate disambiguation batch_69fd39124180819080ca7911d3515d6d completed May 8, 2026, 1:14 a.m.
Created at: May 3, 2026, 4:08 p.m.