Triple
T36194480
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | R142 |
E1047084
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | A Division subway car |
C15202
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: A Division subway car Context triple: [R142, instanceOf, A Division subway car]
-
A.
New York City Subway rolling stock class
chosen
A New York City Subway rolling stock class is a standardized group of subway cars sharing common design, technical specifications, and operational characteristics used on the NYC subway system.
-
B.
New York City Subway yard
A New York City Subway yard is a specialized facility where subway trains are stored, inspected, maintained, and dispatched between periods of service.
-
C.
Toronto subway rolling stock
Toronto subway rolling stock comprises the various generations of electric multiple-unit trains used to provide rapid transit service on the Toronto Transit Commission’s subway and RT lines.
-
D.
Chicago "L" rolling stock
Chicago "L" rolling stock comprises the various types of railcars specifically designed and used for passenger service on Chicago's elevated and subway rapid transit system.
-
E.
New York City Subway terminal
A New York City Subway terminal is a subway station where one or more train lines begin or end their scheduled service, typically featuring multiple tracks, crew facilities, and track arrangements for turning trains around.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e3d4fbc81908c159c7beeb4ce00 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.