Triple
T3618923
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bonneville Dam |
E76672
|
entity |
| Predicate | electricityMarketedBy |
P50470
|
FINISHED |
| Object | Bonneville Power Administration |
E282305
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bonneville Power Administration | Statement: [Bonneville Dam, electricityMarketedBy, Bonneville Power Administration]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bonneville Power Administration Context triple: [Bonneville Dam, electricityMarketedBy, Bonneville Power Administration]
-
A.
Bonneville Power Administration
chosen
Bonneville Power Administration is a U.S. federal agency that markets and transmits electric power, primarily from hydroelectric dams in the Pacific Northwest.
-
B.
Western Area Power Administration
Western Area Power Administration is a U.S. federal agency that markets and transmits wholesale hydroelectric power across the western and central United States.
-
C.
Southwestern Power Administration
Southwestern Power Administration is a U.S. federal agency that markets and transmits hydroelectric power generated at federally owned dams across the southwestern region.
-
D.
PacifiCorp
PacifiCorp is a major U.S. electric utility company serving customers across several Western states.
-
E.
Tennessee Valley Authority
The Tennessee Valley Authority is a federally owned U.S. corporation created during the New Deal to provide regional economic development, flood control, and electricity generation in the Tennessee Valley.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: electricityMarketedBy Context triple: [Bonneville Dam, electricityMarketedBy, Bonneville Power Administration]
-
A.
electricityMarket
Indicates a relationship where entities participate in, are associated with, or operate within a system for buying, selling, or trading electrical power.
-
B.
typeOfElectricity
Indicates that one entity specifies the particular kind or category of electricity associated with another entity.
-
C.
electrificationCoverage
Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
-
D.
powerSalesPriority
Indicates the relative importance or preference assigned to selling power or energy products compared to other sales opportunities.
-
E.
electricityUse
Indicates the amount or pattern of electrical energy consumed by an entity during a specified period or activity.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85dae2fc81908d1ceadbc6af0089 |
completed | March 8, 2026, 2:21 p.m. |
| NER | Named-entity recognition | batch_69adc2b72b3481909f4a09000d1815d9 |
completed | March 8, 2026, 6:40 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b4331cc73881908033d001448f0b23 |
completed | March 13, 2026, 3:54 p.m. |
| PD | Predicate disambiguation | batch_69adb83f1e4c8190ab501c1c05b14c08 |
completed | March 8, 2026, 5:56 p.m. |
| PDg | Predicate description generation | batch_69adb9bbb62c8190989629ca11733e1b |
completed | March 8, 2026, 6:02 p.m. |
Created at: March 8, 2026, 3:23 p.m.