Triple
T36159235
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dymchurch sea wall |
E1045826
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal flood defence |
C27469
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal flood defence Context triple: [Dymchurch sea wall, instanceOf, coastal flood defence]
-
A.
coastal defence
chosen
Coastal defence is the set of structures, natural features, and management strategies designed to protect coastlines from erosion, flooding, and storm impacts.
-
B.
coastal floodplain
A coastal floodplain is a low-lying, relatively flat land area adjacent to a coast that is periodically inundated by seawater due to tides, storm surges, or sea-level rise.
-
C.
coastal passage
A coastal passage is a navigable route that follows along a shoreline, often using natural channels and sheltered waters between the coast and offshore features such as islands or reefs.
-
D.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
E.
coastal management approach
A coastal management approach is a strategic framework of policies, practices, and interventions designed to protect, use, and sustainably develop coastal zones while balancing environmental, economic, and social interests.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e38903c8190a52887620f90aabe |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.