Triple
T3615856
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tarbela Dam |
E76597
|
entity |
| Predicate | owner |
P347
|
FINISHED |
| Object |
Water and Power Development Authority
The Water and Power Development Authority (WAPDA) is Pakistan’s federal agency responsible for the development and management of the country’s water and hydropower resources, including major dams and related infrastructure.
|
E373251
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Water and Power Development Authority | Statement: [Tarbela Dam, owner, Water and Power Development Authority]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Water and Power Development Authority Context triple: [Tarbela Dam, owner, Water and Power Development Authority]
-
A.
Narmada Hydroelectric Development Corporation
Narmada Hydroelectric Development Corporation is a power generation company responsible for developing and operating major hydroelectric projects on the Narmada River in India.
-
B.
Sardar Sarovar Narmada Nigam Limited
Sardar Sarovar Narmada Nigam Limited is a government-owned corporation of the state of Gujarat responsible for implementing and operating the Sardar Sarovar Project on the Narmada River, including its large-scale irrigation and water supply systems.
-
C.
Karnataka Power Corporation Limited
Karnataka Power Corporation Limited is a state-owned enterprise responsible for generating and supplying electricity in the Indian state of Karnataka through a portfolio of thermal, hydroelectric, and renewable power projects.
-
D.
Narmada Control Authority
The Narmada Control Authority is a statutory body in India responsible for coordinating and regulating the planning, construction, and operation of inter-state projects on the Narmada River, including major dams and related infrastructure.
-
E.
Rural Electrification Administration
The Rural Electrification Administration was a New Deal-era U.S. government agency that financed and promoted the extension of electric power to rural and farm areas across the country.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Water and Power Development Authority Triple: [Tarbela Dam, owner, Water and Power Development Authority]
Generated description
The Water and Power Development Authority (WAPDA) is Pakistan’s federal agency responsible for the development and management of the country’s water and hydropower resources, including major dams and related infrastructure.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Water and Power Development Authority Target entity description: The Water and Power Development Authority (WAPDA) is Pakistan’s federal agency responsible for the development and management of the country’s water and hydropower resources, including major dams and related infrastructure.
-
A.
Narmada Hydroelectric Development Corporation
Narmada Hydroelectric Development Corporation is a power generation company responsible for developing and operating major hydroelectric projects on the Narmada River in India.
-
B.
Sardar Sarovar Narmada Nigam Limited
Sardar Sarovar Narmada Nigam Limited is a government-owned corporation of the state of Gujarat responsible for implementing and operating the Sardar Sarovar Project on the Narmada River, including its large-scale irrigation and water supply systems.
-
C.
Karnataka Power Corporation Limited
Karnataka Power Corporation Limited is a state-owned enterprise responsible for generating and supplying electricity in the Indian state of Karnataka through a portfolio of thermal, hydroelectric, and renewable power projects.
-
D.
Narmada Control Authority
The Narmada Control Authority is a statutory body in India responsible for coordinating and regulating the planning, construction, and operation of inter-state projects on the Narmada River, including major dams and related infrastructure.
-
E.
Rural Electrification Administration
The Rural Electrification Administration was a New Deal-era U.S. government agency that financed and promoted the extension of electric power to rural and farm areas across the country.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85dae2fc81908d1ceadbc6af0089 |
completed | March 8, 2026, 2:21 p.m. |
| NER | Named-entity recognition | batch_69adc27b5e008190a72a8dab7d736e64 |
completed | March 8, 2026, 6:39 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b433184a4081908598f4084e959c2e |
completed | March 13, 2026, 3:54 p.m. |
| NEDg | Description generation | batch_69b436e75b6081908a64983955504af8 |
completed | March 13, 2026, 4:10 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b43aa17e048190a39eb22a5be9da0c |
completed | March 13, 2026, 4:26 p.m. |
Created at: March 8, 2026, 3:23 p.m.