Triple

T36142503
Position Surface form Disambiguated ID Type / Status
Subject Torsby Ski Tunnel E1045350 entity
Predicate instanceOf P0 FINISHED
Object indoor ski facility C35266 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: indoor ski facility
Context triple: [Torsby Ski Tunnel, instanceOf, indoor ski facility]
  • A. indoor ski slope chosen
    An indoor ski slope is a large, climate-controlled facility that simulates snowy mountain conditions to allow skiing and snowboarding year-round regardless of outdoor weather.
  • B. ski area facility
    A ski area facility is a designated location equipped with infrastructure and services that support skiing and related winter sports activities, such as lifts, trails, rentals, and lodges.
  • C. ice rink
    An ice rink is a smooth, frozen surface, either natural or artificial, designed for activities such as ice skating, ice hockey, and figure skating, typically enclosed by barriers and maintained at low temperatures.
  • D. indoor ride
    An indoor ride is an amusement attraction located within an enclosed structure that uses controlled environments, lighting, and special effects to create an immersive ride experience.
  • E. roller skating rink
    A roller skating rink is an indoor or outdoor facility with a smooth, oval or rectangular surface designed for people to skate recreationally or competitively on roller skates, often accompanied by music, lighting, and rental services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e37ace88190a906b107d388f5d1 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:08 p.m.