Triple
T36120291
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | AMG SPEEDSHIFT MCT automatic transmission |
E1044723
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Mercedes-AMG technology |
C64737
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Mercedes-AMG technology Context triple: [AMG SPEEDSHIFT MCT automatic transmission, instanceOf, Mercedes-AMG technology]
-
A.
Mercedes-AMG vehicle
A Mercedes-AMG vehicle is a high-performance, luxury automobile engineered by Mercedes-Benz’s AMG division, featuring powerful engines, sport-tuned dynamics, and distinctive styling enhancements.
-
B.
Mercedes-Benz engine
A Mercedes-Benz engine is a high-performance internal combustion or hybrid power unit engineered by Mercedes-Benz to deliver refined power, efficiency, and reliability for the brand’s vehicles.
-
C.
Porsche technology
Porsche technology encompasses the advanced engineering, innovative powertrain systems, precision aerodynamics, and cutting-edge digital features that enhance performance, efficiency, and driving experience across Porsche vehicles.
-
D.
Porsche technology feature
A Porsche technology feature is an advanced, performance-oriented system or innovation integrated into Porsche vehicles to enhance driving dynamics, safety, efficiency, or user experience.
-
E.
Mercedes-Benz automobile platform
A Mercedes-Benz automobile platform is a shared structural and engineering foundation used across multiple Mercedes-Benz vehicle models to standardize components, optimize production, and define key characteristics such as size, drivetrain layout, and suspension design.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e356c908190abc6ca1e6a05b011 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.