Triple
T36114914
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Toyota rally-raid programs |
E1044593
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | factory motorsport program |
C62078
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: factory motorsport program Context triple: [Toyota rally-raid programs, instanceOf, factory motorsport program]
-
A.
factory-backed motorsport team
A factory-backed motorsport team is a racing organization that receives direct financial, technical, and logistical support from an automobile manufacturer to develop and compete with its vehicles.
-
B.
Toyota motorsport program
chosen
The Toyota motorsport program is the coordinated global effort by Toyota to design, develop, and campaign racing vehicles across multiple disciplines—such as rally, endurance, and single-seater series—to advance technology, strengthen brand image, and support driver and engineering talent.
-
C.
auto racing team
An auto racing team is an organized group that designs, builds, maintains, and competitively races automobiles under a unified management, brand, and strategy.
-
D.
motorsport family
A motorsport family is a group of closely related individuals whose lives, identities, and often careers are deeply intertwined with competitive racing across generations.
-
E.
racing car constructor
A racing car constructor is an organization that designs, engineers, builds, and develops competitive race cars, often for participation in professional motorsport series.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e344a4c8190af3858c6d78ba88f |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.