Triple
T36096466
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Progress M-34 |
E1044075
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Progress spacecraft |
C2826
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Progress spacecraft Context triple: [Progress M-34, instanceOf, Progress spacecraft]
-
A.
spacecraft program
A spacecraft program is an organized, long-term initiative that plans, develops, launches, and operates one or more spacecraft to achieve specific scientific, commercial, or exploratory objectives.
-
B.
spacecraft
chosen
A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
-
C.
NASA spacecraft program
A NASA spacecraft program is an organized initiative that designs, develops, launches, and operates one or more spacecraft to achieve specific scientific, exploratory, or technological objectives in space.
-
D.
uncrewed spaceflight
Uncrewed spaceflight is the operation of spacecraft without human passengers onboard, using automated systems and remote control to conduct missions such as exploration, observation, and technology testing in space.
-
E.
Orion program activity
Orion program activity is any discrete task, operation, or event carried out as part of planning, developing, testing, or executing the Orion spacecraft program.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e32d60c8190ba781ffaaab4aa3d |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.