Triple

T36084317
Position Surface form Disambiguated ID Type / Status
Subject Public Law 95-617 E1043734 entity
Predicate instanceOf P0 FINISHED
Object utility regulation law C31860 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: utility regulation law
Context triple: [Public Law 95-617, instanceOf, utility regulation law]
  • A. economic regulation
    Economic regulation is the set of laws, rules, and administrative actions through which governments influence, control, or guide economic activity, markets, and business behavior to achieve public policy objectives.
  • B. Electricity regulatory commission
    An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
  • C. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • D. regulations chosen
    Regulations are authoritative rules or directives established by a governing body to control, manage, or guide behaviors and processes within a specific domain.
  • E. antitrust enforcement regulation
    Antitrust enforcement regulation is the body of laws, policies, and procedures through which governments prevent, investigate, and remedy anti-competitive business practices to protect market competition and consumer welfare.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e3154908190a6f702671c2bea08 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:08 p.m.