Triple
T36077291
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Murrumbidgee Irrigation Limited |
E1043530
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | irrigation infrastructure operator |
C51392
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: irrigation infrastructure operator Context triple: [Murrumbidgee Irrigation Limited, instanceOf, irrigation infrastructure operator]
-
A.
irrigation organization
chosen
An irrigation organization is an entity that plans, manages, and coordinates the distribution and maintenance of water resources and infrastructure for agricultural or landscape irrigation within a defined area.
-
B.
irrigation equipment manufacturer
An irrigation equipment manufacturer is a company that designs, produces, and supplies systems and components used to deliver water efficiently to agricultural, landscaping, or industrial areas.
-
C.
irrigation network
An irrigation network is an interconnected system of channels, pipes, and control structures designed to distribute water efficiently from a source to agricultural fields or other areas requiring controlled watering.
-
D.
irrigated district
An irrigated district is a geographically defined area where water is systematically supplied and managed, typically through infrastructure like canals and pipelines, to support agricultural production and related land uses.
-
E.
irrigation command area
An irrigation command area is the total land surface that can be supplied with water from a specific irrigation system or source under its designed operating conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e3154908190a6f702671c2bea08 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.