Triple
T36076841
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grimsby and Immingham Electric Railway |
E1043518
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | inter-urban tramway |
C17649
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: inter-urban tramway Context triple: [Grimsby and Immingham Electric Railway, instanceOf, inter-urban tramway]
-
A.
interurban railroad
chosen
An interurban railroad is an electric railway system that provides passenger and sometimes freight service between cities and towns, typically operating on dedicated tracks or street-running routes over medium distances.
-
B.
suburban commuter train
A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
-
C.
horse-drawn tramway
A horse-drawn tramway is a rail-based transport system in which carriages or trams run on fixed tracks and are pulled by horses, typically used for urban or short-distance passenger and freight services before the advent of mechanized traction.
-
D.
suburban railway branch
A suburban railway branch is a secondary rail line that diverges from a main route to serve residential and commuter areas on the outskirts of a city.
-
E.
suburban railway corridor
A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e3154908190a6f702671c2bea08 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:08 p.m.