Triple

T36058777
Position Surface form Disambiguated ID Type / Status
Subject Kuala Lumpur–Beijing route E1043018 entity
Predicate instanceOf P0 FINISHED
Object commercial flight corridor C31875 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commercial flight corridor
Context triple: [Kuala Lumpur–Beijing route, instanceOf, commercial flight corridor]
  • A. commercial airline flight
    A commercial airline flight is a scheduled air transport service that carries paying passengers and cargo between designated airports using certified aircraft operated by licensed carriers.
  • B. commercial passenger flight
    A commercial passenger flight is a scheduled or chartered air transport service that carries paying travelers between airports using certificated aircraft operated by licensed airlines.
  • C. commercial airline
    A commercial airline is a company that provides scheduled air transportation services for passengers and cargo using a fleet of aircraft.
  • D. regional air route chosen
    A regional air route is a defined flight path connecting airports within a specific geographic area, typically served by short- to medium-haul aircraft to facilitate local or intra-regional air travel.
  • E. transcontinental air route
    A transcontinental air route is a regularly operated flight path that connects airports on different continents, enabling long-distance international air travel across major landmasses or oceans.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2f09448190b0486d5ecad5e243 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:08 p.m.