Triple

T36050837
Position Surface form Disambiguated ID Type / Status
Subject AEDC E1042803 entity
Predicate instanceOf P0 FINISHED
Object United States Air Force test and evaluation center C5748 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: United States Air Force test and evaluation center
Context triple: [AEDC, instanceOf, United States Air Force test and evaluation center]
  • A. Air Force Sustainment Center (AFSC)
    The Air Force Sustainment Center (AFSC) is a major U.S. Air Force organization responsible for providing depot maintenance, supply chain management, and sustainment support to ensure the readiness and availability of air and space weapon systems.
  • B. Air and Space Operations Center
    An Air and Space Operations Center is a command and control facility that plans, directs, coordinates, and monitors air and space operations to achieve assigned military objectives.
  • C. Space Delta
    Space Delta is a specialized organizational unit within a space force structure, responsible for executing a distinct mission area such as operations, intelligence, or support in the space domain.
  • D. flight test center chosen
    A flight test center is a specialized facility where aircraft, spacecraft, or related systems are systematically tested, evaluated, and validated under controlled conditions to ensure performance, safety, and regulatory compliance.
  • E. F-35 training facility
    A F-35 training facility is a specialized center equipped with simulators, classrooms, and support infrastructure where pilots and maintenance personnel are trained in the operation, tactics, and upkeep of F-35 fighter aircraft.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2e41f8819091f9fb0536920fec completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.