Triple
T36050837
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | AEDC |
E1042803
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | United States Air Force test and evaluation center |
C5748
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: United States Air Force test and evaluation center Context triple: [AEDC, instanceOf, United States Air Force test and evaluation center]
-
A.
Air Force Sustainment Center (AFSC)
The Air Force Sustainment Center (AFSC) is a major U.S. Air Force organization responsible for providing depot maintenance, supply chain management, and sustainment support to ensure the readiness and availability of air and space weapon systems.
-
B.
Air and Space Operations Center
An Air and Space Operations Center is a command and control facility that plans, directs, coordinates, and monitors air and space operations to achieve assigned military objectives.
-
C.
Space Delta
Space Delta is a specialized organizational unit within a space force structure, responsible for executing a distinct mission area such as operations, intelligence, or support in the space domain.
-
D.
flight test center
chosen
A flight test center is a specialized facility where aircraft, spacecraft, or related systems are systematically tested, evaluated, and validated under controlled conditions to ensure performance, safety, and regulatory compliance.
-
E.
F-35 training facility
A F-35 training facility is a specialized center equipped with simulators, classrooms, and support infrastructure where pilots and maintenance personnel are trained in the operation, tactics, and upkeep of F-35 fighter aircraft.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e2e41f8819091f9fb0536920fec |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:07 p.m.