Triple

T36049814
Position Surface form Disambiguated ID Type / Status
Subject Brilliant Substation E1042775 entity
Predicate instanceOf P0 FINISHED
Object power infrastructure facility C53974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power infrastructure facility
Context triple: [Brilliant Substation, instanceOf, power infrastructure facility]
  • A. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • B. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • C. electrical substation chosen
    An electrical substation is a facility in the power system where voltage levels are transformed, controlled, and distributed using equipment such as transformers, switchgear, and protection devices.
  • D. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • E. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2e41f8819091f9fb0536920fec completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.