Triple
T36049814
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brilliant Substation |
E1042775
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power infrastructure facility |
C53974
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power infrastructure facility Context triple: [Brilliant Substation, instanceOf, power infrastructure facility]
-
A.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
B.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
C.
electrical substation
chosen
An electrical substation is a facility in the power system where voltage levels are transformed, controlled, and distributed using equipment such as transformers, switchgear, and protection devices.
-
D.
nuclear power facility
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
-
E.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e2e41f8819091f9fb0536920fec |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:07 p.m.