Triple

T36014100
Position Surface form Disambiguated ID Type / Status
Subject New York City Subway station complexes E1041791 entity
Predicate instanceOf P0 FINISHED
Object public transit facility type C7253 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transit facility type
Context triple: [New York City Subway station complexes, instanceOf, public transit facility type]
  • A. public transit vehicle type
    A public transit vehicle type is a category of transportation mode (such as bus, tram, subway, or ferry) used to provide shared, scheduled travel services to the general public.
  • B. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • C. public transit station chosen
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • D. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2b981881908e4e160607fa82eb completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.