Triple

T35991805
Position Surface form Disambiguated ID Type / Status
Subject USS Spiegel Grove E1040866 entity
Predicate instanceOf P0 FINISHED
Object Thomaston-class dock landing ship C62061 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Thomaston-class dock landing ship
Context triple: [USS Spiegel Grove, instanceOf, Thomaston-class dock landing ship]
  • A. Harris-class attack transport
    The Harris-class attack transport was a class of U.S. Navy amphibious assault ships, converted from passenger liners, designed to carry troops and landing craft for beach invasions during World War II.
  • B. Benham-class destroyer
    The Benham-class destroyer was a group of U.S. Navy warships built in the late 1930s, designed for high-speed fleet screening and anti-submarine warfare with improved torpedo armament and maneuverability.
  • C. Oliver Hazard Perry-class frigate
    The Oliver Hazard Perry-class frigate is a class of guided-missile frigates designed for anti-submarine, anti-air, and limited surface warfare, primarily serving as versatile escort ships for larger naval task forces.
  • D. Knox-class frigate
    The Knox-class frigate is a class of U.S. Navy anti-submarine warfare ships built in the late 1960s and 1970s, designed for long-range escort duties with advanced sonar, helicopter facilities, and limited anti-air and surface warfare capabilities.
  • E. Pensacola-class cruiser
    The Pensacola-class cruiser was a pair of early U.S. Navy "treaty cruisers" built in the late 1920s, characterized by heavy 8-inch guns, relatively light armor, and high speed, serving prominently in the Pacific during World War II.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e29084c819083987b828d414de7 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.