Triple

T35962030
Position Surface form Disambiguated ID Type / Status
Subject Sukhoi PT-14 E1040023 entity
Predicate instanceOf P0 FINISHED
Object experimental jet aircraft prototype C6075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: experimental jet aircraft prototype
Context triple: [Sukhoi PT-14, instanceOf, experimental jet aircraft prototype]
  • A. experimental aircraft chosen
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. experimental jet-style powerplant
    An experimental jet-style powerplant is a prototype propulsion system that generates thrust by accelerating a high-velocity stream of exhaust gases, typically to test new aerodynamic, thermodynamic, or fuel technologies for advanced aircraft or related vehicles.
  • C. experimental aircraft program series
    A coordinated sequence of research and development efforts focused on designing, building, testing, and evaluating prototype aircraft to explore new aerospace technologies, performance capabilities, and operational concepts.
  • D. nuclear-powered aircraft prototype
    A nuclear-powered aircraft prototype is an experimental aircraft design that uses a nuclear reactor as its primary energy source to generate thrust or power propulsion systems, aiming for extremely long endurance without refueling.
  • E. jet-powered hydroplane
    A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e26b21081909fd9ffb3aff6c77a completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.