Triple

T35951307
Position Surface form Disambiguated ID Type / Status
Subject Sukhoi PT-13 E1039734 entity
Predicate instanceOf P0 FINISHED
Object interceptor aircraft prototype C61730 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interceptor aircraft prototype
Context triple: [Sukhoi PT-13, instanceOf, interceptor aircraft prototype]
  • A. experimental aircraft
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. proposed airliner
    A proposed airliner is a conceptual design for a future commercial passenger aircraft that outlines intended performance, capacity, technology, and operational roles but has not yet been built or certified.
  • C. military aircraft project chosen
    A military aircraft project is an organized effort to design, develop, test, and produce an aircraft intended for defense or combat roles, encompassing technical, logistical, financial, and strategic considerations.
  • D. nuclear-powered aircraft prototype
    A nuclear-powered aircraft prototype is an experimental aircraft design that uses a nuclear reactor as its primary energy source to generate thrust or power propulsion systems, aiming for extremely long endurance without refueling.
  • E. prototype bomber aircraft
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e25ea488190b7cee970b3e70382 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.