Triple

T35937941
Position Surface form Disambiguated ID Type / Status
Subject Rough River Dam project E1039356 entity
Predicate instanceOf P0 FINISHED
Object flood control project C1458 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e24bbd0819096b837d35371639a completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.