Triple

T35917511
Position Surface form Disambiguated ID Type / Status
Subject Hinkelsteine E1038787 entity
Predicate instanceOf P0 FINISHED
Object concrete barrier C21525 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concrete barrier
Context triple: [Hinkelsteine, instanceOf, concrete barrier]
  • A. barrier chosen
    A barrier is an obstacle or boundary—physical, social, or conceptual—that restricts, slows, or prevents movement, interaction, or progress.
  • B. water barrier
    A water barrier is a structure, material, or system designed to prevent or control the passage, infiltration, or flow of water between distinct areas or environments.
  • C. concrete pillar
    A concrete pillar is a vertical structural element made of reinforced or plain concrete that supports loads from above and transfers them safely to the foundation.
  • D. retaining wall
    A retaining wall is a rigid structure designed to hold back soil or other materials at different elevations, preventing erosion and providing lateral support.
  • E. concrete structure
    A concrete structure is a physical construction made primarily from concrete, designed to bear loads and provide durable, stable support in buildings and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2320748190b7f5c4750d0cd0d3 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.