Triple

T35886514
Position Surface form Disambiguated ID Type / Status
Subject Marlex E1037659 entity
Predicate instanceOf P0 FINISHED
Object industrial material C56513 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industrial material
Context triple: [Marlex, instanceOf, industrial material]
  • A. industrial product
    An industrial product is a manufactured good, component, or system designed primarily for use in production, construction, or operational processes within industrial or commercial settings rather than for direct consumer use.
  • B. construction material
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • C. material chosen
    Material is any physical substance or matter from which objects, products, or structures are made, characterized by specific properties that determine its suitability for various uses.
  • D. engineering material
    An engineering material is any substance or combination of substances with specific mechanical, physical, and chemical properties that make it suitable for designing, constructing, and operating engineered structures, machines, or systems.
  • E. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e1f4d748190bb55594d8441d70e completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:06 p.m.