Triple

T35880882
Position Surface form Disambiguated ID Type / Status
Subject Salton Sea Geothermal Field E1037502 entity
Predicate estimatedElectricalCapacity P53312 FINISHED
Object hundreds of megawatts LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hundreds of megawatts | Statement: [Salton Sea Geothermal Field, estimatedElectricalCapacity, hundreds of megawatts]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: estimatedElectricalCapacity
Context triple: [Salton Sea Geothermal Field, estimatedElectricalCapacity, hundreds of megawatts]
  • A. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. batteryCapacity
    Indicates the amount of electrical energy a battery can store or deliver, typically expressed in units like mAh or Wh.
  • C. electricalPower
    Indicates that one entity supplies, carries, or is associated with electrical power to or for another entity.
  • D. totalElectricalCapacity_MWe chosen
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • E. plannedCapacityMW
    Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e1f4d748190bb55594d8441d70e completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69f7aa3883d48190b05e3d2da7a017ae completed May 3, 2026, 8:04 p.m.
PD Predicate disambiguation batch_69f7a8d435288190b30b1991fb003121 completed May 3, 2026, 7:58 p.m.
Created at: May 3, 2026, 4:06 p.m.