Triple
T35880882
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Salton Sea Geothermal Field |
E1037502
|
entity |
| Predicate | estimatedElectricalCapacity |
P53312
|
FINISHED |
| Object | hundreds of megawatts |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hundreds of megawatts | Statement: [Salton Sea Geothermal Field, estimatedElectricalCapacity, hundreds of megawatts]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: estimatedElectricalCapacity Context triple: [Salton Sea Geothermal Field, estimatedElectricalCapacity, hundreds of megawatts]
-
A.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
B.
batteryCapacity
Indicates the amount of electrical energy a battery can store or deliver, typically expressed in units like mAh or Wh.
-
C.
electricalPower
Indicates that one entity supplies, carries, or is associated with electrical power to or for another entity.
-
D.
totalElectricalCapacity_MWe
chosen
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
E.
plannedCapacityMW
Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e1f4d748190bb55594d8441d70e |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_69f7aa3883d48190b05e3d2da7a017ae |
completed | May 3, 2026, 8:04 p.m. |
| PD | Predicate disambiguation | batch_69f7a8d435288190b30b1991fb003121 |
completed | May 3, 2026, 7:58 p.m. |
Created at: May 3, 2026, 4:06 p.m.