Triple

T35858647
Position Surface form Disambiguated ID Type / Status
Subject 大和路快速 E1036578 entity
Predicate instanceOf P0 FINISHED
Object 快速列車 C62037 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 快速列車
Context triple: [大和路快速, instanceOf, 快速列車]
  • A. limited express train
    A limited express train is a high-speed passenger service that stops only at major stations to provide faster travel between key destinations.
  • B. high-speed railway
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • C. high-speed electric multiple unit train
    A high-speed electric multiple unit train is a self-propelled, electrically powered passenger trainset composed of multiple interconnected cars, designed to operate at very high speeds with rapid acceleration, efficient braking, and streamlined aerodynamics for intercity or regional service.
  • D. high-speed test train
    A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
  • E. Japanese Shinkansen train series
    A Japanese Shinkansen train series is a family of high-speed electric multiple unit trains designed and operated for rapid, reliable, and comfortable intercity passenger service on Japan’s dedicated bullet train network.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e1b4aa481909630373171eb5ec6 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:06 p.m.