Triple

T3578727
Position Surface form Disambiguated ID Type / Status
Subject Caroni River E75748 entity
Predicate formsPartOf P840 FINISHED
Object Guri Reservoir E377146 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Guri Reservoir | Statement: [Caroni River, formsPartOf, Guri Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Guri Reservoir
Context triple: [Caroni River, formsPartOf, Guri Reservoir]
  • A. Guri Dam chosen
    Guri Dam is one of the world’s largest hydroelectric dams, located on the Caroní River in Venezuela and a major source of the country’s electricity.
  • B. Shimen Reservoir
    Shimen Reservoir is a major multipurpose reservoir in Taoyuan, Taiwan, known for water supply, flood control, irrigation, and recreation.
  • C. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • D. Sutami Dam
    Sutami Dam is a major multipurpose dam in East Java, Indonesia, used primarily for hydroelectric power generation, irrigation, and flood control on the Brantas River.
  • E. Tominé Reservoir
    Tominé Reservoir is a large artificial lake in Colombia’s Cundinamarca department, known for supplying water to Bogotá and serving as a popular site for sailing and other water sports.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d5e3008190bdfe0bacdd1f5a1b completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc0defe14819095a337a840e33300 completed March 8, 2026, 6:33 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4e4d974f081909c98ddaf55aab8cc completed March 14, 2026, 4:32 a.m.
Created at: March 8, 2026, 3:21 p.m.