Triple

T3578714
Position Surface form Disambiguated ID Type / Status
Subject Caroni River E75748 entity
Predicate hasHydroelectricDam P15311 FINISHED
Object Caruachi Dam E370138 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Caruachi Dam | Statement: [Caroni River, hasHydroelectricDam, Caruachi Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Caruachi Dam
Context triple: [Caroni River, hasHydroelectricDam, Caruachi Dam]
  • A. San Carlos Dam
    San Carlos Dam is a major concrete gravity dam in Arizona that creates San Carlos Lake and provides irrigation water, flood control, and hydroelectric power along the Gila River.
  • B. El Quimbo Dam
    El Quimbo Dam is a large hydroelectric dam on the Magdalena River in Colombia, built to generate power and support the country’s energy supply.
  • C. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • D. Macagua Dam chosen
    Macagua Dam is a major hydroelectric dam complex in Venezuela that forms part of the Guri–Macagua–Caruachi system generating power from the Caroní River.
  • E. Pangue Dam
    Pangue Dam is a major hydroelectric power facility in Chile, built on the Biobío River to generate electricity and support the country’s energy needs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d5e3008190bdfe0bacdd1f5a1b completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc0defe14819095a337a840e33300 completed March 8, 2026, 6:33 p.m.
NED1 Entity disambiguation (via context triple) batch_69b402ef79e481909acd5d96678bc003 completed March 13, 2026, 12:28 p.m.
Created at: March 8, 2026, 3:21 p.m.