Triple

T3578454
Position Surface form Disambiguated ID Type / Status
Subject Koshi River E75742 entity
Predicate infrastructure P19374 FINISHED
Object Koshi Barrage E160353 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Koshi Barrage | Statement: [Koshi River, infrastructure, Koshi Barrage]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Koshi Barrage
Context triple: [Koshi River, infrastructure, Koshi Barrage]
  • A. Ralco Dam
    Ralco Dam is a major hydroelectric power plant in Chile, known for its large reservoir and controversial impact on the local environment and indigenous communities.
  • B. Pandoh Dam
    Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
  • C. Karcham Wangtoo Dam
    Karcham Wangtoo Dam is a major hydroelectric gravity dam in Himachal Pradesh, India, known for its large underground power station harnessing the Sutlej River in the Himalayas.
  • D. Kota Barrage
    Kota Barrage is a major irrigation and water-regulation dam located near Kota in Rajasthan, India, built across the Chambal River.
  • E. Kosi Barrage chosen
    Kosi Barrage is a major flood-control and irrigation structure built across the Kosi River near the India–Nepal border.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d5e3008190bdfe0bacdd1f5a1b completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc0defe14819095a337a840e33300 completed March 8, 2026, 6:33 p.m.
NED1 Entity disambiguation (via context triple) batch_69b43301c2d8819089ee18732c1df29d completed March 13, 2026, 3:53 p.m.
Created at: March 8, 2026, 3:21 p.m.