Triple
T35781234
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | RMC Parade Square (for some events) |
E1034442
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | parade square |
C38718
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: parade square Context triple: [RMC Parade Square (for some events), instanceOf, parade square]
-
A.
Renaissance square
A Renaissance square is a public urban space characterized by harmonious proportions, classical architectural elements, and a central role in civic, commercial, and cultural life during the Renaissance period.
-
B.
parade
A parade is a coordinated public procession of people, vehicles, or floats moving along a designated route, typically held to celebrate, commemorate, or promote a particular event, cause, or group.
-
C.
public square
A public square is an open, communal urban space where people gather for social interaction, events, commerce, and civic activities.
-
D.
planned parade ground
chosen
A planned parade ground is a deliberately designed open space intended for organized public gatherings, ceremonial marches, and military or civic displays.
-
E.
museum plaza
A museum plaza is an open, often landscaped public space adjacent to or integrated with a museum, designed for gathering, circulation, and outdoor cultural activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e14a1e081908eddd57bd6fdb3be |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:06 p.m.