Triple
T35779328
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shanhai Pass defenses |
E1034392
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | border defenses |
C877
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: border defenses Context triple: [Shanhai Pass defenses, instanceOf, border defenses]
-
A.
border defense system
chosen
A border defense system is an integrated network of physical barriers, surveillance technologies, personnel, and response protocols designed to monitor, control, and protect a nation's boundaries from unauthorized crossings and external threats.
-
B.
border troops
Border troops are specialized military or paramilitary forces responsible for monitoring, securing, and defending a nation's borders against illegal crossings, smuggling, and external threats.
-
C.
border stronghold
A border stronghold is a heavily fortified military outpost positioned at the edge of a territory to defend against incursions, control crossings, and project power into adjacent lands.
-
D.
border corridor
A border corridor is a designated strip of land or airspace that provides controlled access or transit along or across a political boundary between two or more territories.
-
E.
border monument
A border monument is a physical marker or structure placed at or near a boundary line to visibly indicate the legal or agreed-upon limits between adjacent properties, regions, or jurisdictions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e14a1e081908eddd57bd6fdb3be |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:06 p.m.