Triple

T35773979
Position Surface form Disambiguated ID Type / Status
Subject Baldeneysee dam E1034240 entity
Predicate instanceOf P0 FINISHED
Object water-retaining structure C58919 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water-retaining structure
Context triple: [Baldeneysee dam, instanceOf, water-retaining structure]
  • A. water reservoir
    A water reservoir is a man-made or natural storage area designed to collect, hold, and regulate water for uses such as drinking supply, irrigation, flood control, and power generation.
  • B. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • C. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • D. hydrotechnical structure chosen
    A hydrotechnical structure is an engineered facility or system designed to control, use, or manage water resources, such as dams, levees, canals, and breakwaters.
  • E. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e14a1e081908eddd57bd6fdb3be completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:06 p.m.