Triple
T35767374
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Great Fish River |
E1034053
|
entity |
| Predicate | hasWaterManagementProject |
P92097
|
FINISHED |
| Object | Orange–Fish River Tunnel scheme |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Orange–Fish River Tunnel scheme | Statement: [Great Fish River, hasWaterManagementProject, Orange–Fish River Tunnel scheme]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasWaterManagementProject Context triple: [Great Fish River, hasWaterManagementProject, Orange–Fish River Tunnel scheme]
-
A.
hasWaterManagementStructure
Indicates that one entity possesses, contains, or is associated with a built feature used to control, store, convey, or manage water.
-
B.
hasWatershedManagementProjects
chosen
Indicates that an entity is involved in or associated with projects focused on managing, protecting, or improving a watershed and its water resources.
-
C.
hasHydroelectricProject
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
D.
typeOfWaterManaged
Indicates the specific kind or category of water that is overseen, controlled, or handled within a management context.
-
E.
hasWaterManagementIssue
Indicates that an entity experiences problems or challenges related to the control, distribution, quality, or availability of water.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e13edd081909101629aa829c4ad |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_69fbad1e94988190b86d447a68e65067 |
completed | May 6, 2026, 9:05 p.m. |
| PD | Predicate disambiguation | batch_69fba881b8e0819094790935152b99a1 |
completed | May 6, 2026, 8:45 p.m. |
Created at: May 3, 2026, 4:06 p.m.