Triple

T35719706
Position Surface form Disambiguated ID Type / Status
Subject Titan II E1032436 entity
Predicate operatorAsICBM P203446 FINISHED
Object Strategic Air Command NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Strategic Air Command | Statement: [Titan II, operatorAsICBM, Strategic Air Command]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatorAsICBM
Context triple: [Titan II, operatorAsICBM, Strategic Air Command]
  • A. isStrategicWeapon
    Indicates that the weapon is designed or classified for large-scale, long-range, or high-impact strategic use rather than for tactical or localized operations.
  • B. retiredAsICBM
    Indicates that an entity has been withdrawn from active service in the role of an intercontinental ballistic missile.
  • C. canServeAsWarheadFor
    Indicates that one entity is suitable or designed to function as the warhead component for another entity, such as a missile or delivery system.
  • D. conversionFromICBM
    Indicates a relationship where something is transformed or repurposed from an intercontinental ballistic missile (ICBM) into another form or use.
  • E. formerLandBasedMissile
    Indicates that something was previously a land-based missile but no longer holds that status.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e102b5881909e5d63a30a5cecbe completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_6a017e7bdfe481909cb4d5bdede6035e completed May 11, 2026, 7 a.m.
PD Predicate disambiguation batch_6a017defee108190bdf5f98dc415b250 completed May 11, 2026, 6:57 a.m.
PDg Predicate description generation batch_6a017e7b0ef4819090f82220b73d0888 completed May 11, 2026, 7 a.m.
Created at: May 3, 2026, 4:05 p.m.