Triple
T35687394
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Army Corps of Engineers (at Terminus Dam) |
E1031187
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | dam operating authority |
C49047
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: dam operating authority Context triple: [U.S. Army Corps of Engineers (at Terminus Dam), instanceOf, dam operating authority]
-
A.
hydropower authority
A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
-
B.
hydropower operations division
The hydropower operations division oversees the planning, control, and maintenance of hydroelectric facilities to ensure safe, efficient, and reliable power generation from water resources.
-
C.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
D.
waterway management organization
chosen
A waterway management organization is an entity responsible for planning, regulating, maintaining, and improving rivers, canals, and related water infrastructure to ensure safe navigation, environmental protection, and sustainable water use.
-
E.
dam expansion project
A dam expansion project is a large-scale infrastructure initiative to increase an existing dam’s capacity, performance, or functionality—typically to enhance water storage, energy generation, or flood control—through structural modifications and associated environmental and social mitigation measures.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e0bb6608190ad3a1880be54a17d |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:05 p.m.