Triple

T35687394
Position Surface form Disambiguated ID Type / Status
Subject U.S. Army Corps of Engineers (at Terminus Dam) E1031187 entity
Predicate instanceOf P0 FINISHED
Object dam operating authority C49047 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dam operating authority
Context triple: [U.S. Army Corps of Engineers (at Terminus Dam), instanceOf, dam operating authority]
  • A. hydropower authority
    A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
  • B. hydropower operations division
    The hydropower operations division oversees the planning, control, and maintenance of hydroelectric facilities to ensure safe, efficient, and reliable power generation from water resources.
  • C. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • D. waterway management organization chosen
    A waterway management organization is an entity responsible for planning, regulating, maintaining, and improving rivers, canals, and related water infrastructure to ensure safe navigation, environmental protection, and sustainable water use.
  • E. dam expansion project
    A dam expansion project is a large-scale infrastructure initiative to increase an existing dam’s capacity, performance, or functionality—typically to enhance water storage, energy generation, or flood control—through structural modifications and associated environmental and social mitigation measures.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0bb6608190ad3a1880be54a17d completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:05 p.m.