Triple
T35677950
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vuoksi River hydropower cascade |
E1030915
|
entity |
| Predicate | planningRequires |
P142794
|
FINISHED |
| Object | coordination with Finnish water authorities |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: coordination with Finnish water authorities | Statement: [Vuoksi River hydropower cascade, planningRequires, coordination with Finnish water authorities]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: planningRequires Context triple: [Vuoksi River hydropower cascade, planningRequires, coordination with Finnish water authorities]
-
A.
planningRequirement
chosen
Indicates that one entity imposes or specifies a planning-related obligation, condition, or prerequisite that must be satisfied by another entity or activity.
-
B.
planningInvolves
Indicates that a planning process includes or takes into account a particular entity, factor, or activity as part of its considerations or steps.
-
C.
planningSupport
Indicates that one entity provides assistance, resources, or guidance to another in the process of planning or preparing for something.
-
D.
planningSkill
Indicates the degree to which an entity is capable of effectively organizing, sequencing, and coordinating actions or resources to achieve goals.
-
E.
planningProcess
Indicates a relationship where an entity is engaged in or associated with the structured activity of defining goals, strategies, and steps to achieve a desired outcome.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e0bb6608190ad3a1880be54a17d |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_69fd2cf39b0c8190811b8a6fa9410560 |
completed | May 8, 2026, 12:23 a.m. |
| PD | Predicate disambiguation | batch_69fd2ad8dd988190a9899701ba00d917 |
completed | May 8, 2026, 12:14 a.m. |
Created at: May 3, 2026, 4:05 p.m.