Triple

T35677950
Position Surface form Disambiguated ID Type / Status
Subject Vuoksi River hydropower cascade E1030915 entity
Predicate planningRequires P142794 FINISHED
Object coordination with Finnish water authorities LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: coordination with Finnish water authorities | Statement: [Vuoksi River hydropower cascade, planningRequires, coordination with Finnish water authorities]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningRequires
Context triple: [Vuoksi River hydropower cascade, planningRequires, coordination with Finnish water authorities]
  • A. planningRequirement chosen
    Indicates that one entity imposes or specifies a planning-related obligation, condition, or prerequisite that must be satisfied by another entity or activity.
  • B. planningInvolves
    Indicates that a planning process includes or takes into account a particular entity, factor, or activity as part of its considerations or steps.
  • C. planningSupport
    Indicates that one entity provides assistance, resources, or guidance to another in the process of planning or preparing for something.
  • D. planningSkill
    Indicates the degree to which an entity is capable of effectively organizing, sequencing, and coordinating actions or resources to achieve goals.
  • E. planningProcess
    Indicates a relationship where an entity is engaged in or associated with the structured activity of defining goals, strategies, and steps to achieve a desired outcome.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0bb6608190ad3a1880be54a17d completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69fd2cf39b0c8190811b8a6fa9410560 completed May 8, 2026, 12:23 a.m.
PD Predicate disambiguation batch_69fd2ad8dd988190a9899701ba00d917 completed May 8, 2026, 12:14 a.m.
Created at: May 3, 2026, 4:05 p.m.