Triple

T35677914
Position Surface form Disambiguated ID Type / Status
Subject Vuoksi River hydropower cascade E1030915 entity
Predicate instanceOf P0 FINISHED
Object infrastructure complex C10698 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure complex
Context triple: [Vuoksi River hydropower cascade, instanceOf, infrastructure complex]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. infrastructure facility chosen
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • C. commercial and transportation complex
    A commercial and transportation complex is a multifunctional facility that integrates retail, business services, and transit infrastructure to support shopping, commerce, and the movement of people and goods.
  • D. institutional building complex
    An institutional building complex is a coordinated group of structures and shared spaces designed to support the functions, services, and administration of an organization such as a university, hospital, or government entity.
  • E. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0bb6608190ad3a1880be54a17d completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:05 p.m.