Triple
T35677883
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Imatra switchyard |
E1030914
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-voltage switchyard |
C53974
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-voltage switchyard Context triple: [Imatra switchyard, instanceOf, high-voltage switchyard]
-
A.
electrical substation
chosen
An electrical substation is a facility in the power system where voltage levels are transformed, controlled, and distributed using equipment such as transformers, switchgear, and protection devices.
-
B.
HVDC interconnector
An HVDC interconnector is a high-voltage direct current transmission link that connects separate power grids or regions to enable efficient long-distance electricity transfer and cross-border energy exchange.
-
C.
high-voltage generator
A high-voltage generator is a device that converts available electrical or mechanical energy into controlled, significantly elevated voltage levels for applications such as testing, research, and specialized industrial processes.
-
D.
electrical enclosure
An electrical enclosure is a protective housing designed to contain electrical components and wiring, shielding them from environmental hazards and preventing accidental contact.
-
E.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e0bb6608190ad3a1880be54a17d |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:05 p.m.