Triple

T35677882
Position Surface form Disambiguated ID Type / Status
Subject Imatra switchyard E1030914 entity
Predicate instanceOf P0 FINISHED
Object electrical substation complex C53974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electrical substation complex
Context triple: [Imatra switchyard, instanceOf, electrical substation complex]
  • A. electrical substation chosen
    An electrical substation is a facility in the power system where voltage levels are transformed, controlled, and distributed using equipment such as transformers, switchgear, and protection devices.
  • B. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • D. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • E. hydroelectric power complex vicinity
    The hydroelectric power complex vicinity is the surrounding area of a hydroelectric facility, encompassing its immediate infrastructure, environmental buffer zones, and adjacent land or water bodies influenced by its operation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0bb6608190ad3a1880be54a17d completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:05 p.m.