Triple

T35670743
Position Surface form Disambiguated ID Type / Status
Subject Nusantara E1030708 entity
Predicate plannedFullCompletion P133759 FINISHED
Object 2045 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2045 | Statement: [Nusantara, plannedFullCompletion, 2045]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedFullCompletion
Context triple: [Nusantara, plannedFullCompletion, 2045]
  • A. plannedAt
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • B. originalCompletionDate
    Indicates the date on which something was first completed, before any subsequent changes, revisions, or updates.
  • C. completionOf
    Indicates that one entity represents the finished state, fulfillment, or successful conclusion of another entity, process, or requirement.
  • D. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • E. plannedOperationUntil chosen
    Indicates that an operation is scheduled or intended to continue up to a specified end time or condition.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0acfc0819082c8495c2210ce73 completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69fd2a215d6c8190a1a428ccaee603f1 completed May 8, 2026, 12:11 a.m.
PD Predicate disambiguation batch_69fd28ef19688190bb8370f2812a43e7 completed May 8, 2026, 12:06 a.m.
Created at: May 3, 2026, 4:05 p.m.