Triple
T35659495
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Babbacombe Cliff Railway |
E1030387
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cliff railway |
C41189
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cliff railway Context triple: [Babbacombe Cliff Railway, instanceOf, cliff railway]
-
A.
water-powered cliff railway
A water-powered cliff railway is a funicular transport system on a steep incline where two counterbalanced cars move up and down using water-filled tanks and gravity instead of engines.
-
B.
incline railway
chosen
An incline railway is a transportation system that uses cable-hauled rail cars to move passengers or goods up and down steep slopes along fixed tracks.
-
C.
mountain tramway
A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
-
D.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
E.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e09f87881909c954aaac176c34f |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:05 p.m.